On both license areas the complex of works approved in diamond geology is applied, allowing to localize a productive layer by a network of mine workings and to classify the proved reserves and forecast resources on categories C1+C2+P1. On the basis of the developed conditions the calculation of reserves of categories C1+C2, forecast resources of categories P1+P2 and their state examination in State committee on reserves of the Ministry of natural resources and ecology of the Russian Federation will be carried out. After the procedure prescribed by law, the company has a priority right to obtain a through license for exploration and mining for its licensed deposits.
In 2016, preparatory, field and desk works were carried out. Promising areas for industrial alluvial diamond bearing have been identified.
During the 2017 – 2018 field season, prospecting and mapping routes were performed, which allowed to map the boundary of the productive horizon, which in turn allows to significantly adjust the points of laying of prospecting and mapping wells. After 3 km, three ditches were manually passed, with which productive Triassic deposits were opened and tested in a representative volume. Productive formations are enriched on a manual concentrator.
Photos of exploration at ALMAR licensed deposits can be found at Newsroom/Photo gallery.
On both license areas the complex of works approved in diamond geology is applied, allowing to localize a productive layer by a network of mine workings and to classify the proved reserves and forecast resources on categories C1+C2+P1. On the basis of the developed conditions the calculation of reserves of categories C1+C2, forecast resources of categories P1+P2 and their state examination in State committee on reserves of the Ministry of natural resources and ecology of the Russian Federation will be carried out. After the procedure prescribed by law, the company has a priority right to obtain a through license for exploration and mining for its licensed deposits.
In 2016, preparatory, field and desk works were carried out. Promising areas for industrial alluvial diamond bearing have been identified.
During the 2017 – 2018 field season, prospecting and mapping routes were performed, which allowed to map the boundary of the productive horizon, which in turn allows to significantly adjust the points of laying of prospecting and mapping wells. After 3 km, three ditches were manually passed, with which productive Triassic deposits were opened and tested in a representative volume. Productive formations are enriched on a manual concentrator.
Photos of exploration at ALMAR licensed deposits can be found at Newsroom/Photo gallery.